Every 6th car with a cast iron cylinder block has a block from Brühl!
A lot has to be done to ensure that our customers receive their product in the required quantities, at the desired time and in perfect quality.
The production and transportation of mass flows is only possible with well-functioning logistics. We have the concept, the technology and the people to ensure that our products reach their destination on time.
We move:
In procurement:
1,300 tons of scrap and alloys
approx. 50 truckloads
200 tons of coke
approx. 8 truckloads
1000 tons of sand
approx. 50 truckloads
In production:
1,000 tons of sand
approx. 50 truckloads
1,800 tons of liquid iron
approx. 8 truckloads
approx. 7,500 molds
approx. 150,000 cores
On delivery:
20,000 engine blocks
approx. 50 trucks and rail containers
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.